A portion of the York Boulevard Parking lot detour road will be closed July 12 to 15

Beginning on Tuesday, July 12 and continuing to Friday, July 15, a portion of the York Boulevard Parking Lot Detour Road will be closed for utility work. Flag personnel will be there to maintain vehicular traffic in both directions. Pedestrian access will also be maintained. The work area is shown in green on the graphic. The landscaped berm beside the York Boulevard Parking Lot and the contractor’s road access to the construction trailers will also be used during this work (green area on the graphic).

A map of the area affected by the temporary closure of the York Lanes detour route
A map of the area affected by the temporary closure of the York Lanes detour route

The inbound and outbound TTC transit routes and bus stops remain the same.

Construction work includes the use of a mini-excavator in the berm area. Noise and vibration is to be expected during this construction work. Construction work will take place between 7am and 5pm from July 12 to 15.

The full notice is available here.