CSBO notice of interruption to electrical service

York University’s Keele campus

Please be advised that due to electrical repair and testing at the Keele Main Substation, pre-switching will take place on Thursday, May 11 between 6:40 and 7:30am, resulting in an electrical shut down outage time of two to three minutes each to the following buildings (in the order shown). There will be an approximately 10-minute intervals between buildings.

• Tait McKenzie Centre
• Petrie Science and Engineering and West Office Building

Please be advised that due to electrical repair and testing at Keele Main Substation, pre-switching will take place on Friday, May 12 between 6:40 and 6:45am, resulting in an electrical shut down outage time of two to three minutes to the following buildings.

• Kinsmen and Computer Methods Building

Kindly be further advised that due to electrical repair and testing at Keele Main Substation a 30-minute outage will take place on Saturday, May 13 between 11:30am and noon impacting the following buildings. It is anticipated the half hour will not be needed.

• Winters College and Winters Residence
• Vanier College and Vanier Residence
• Stong College, Stong Kitchen and Stong Residence
• McLaughlin College and Tatham Hall Residence

As a reminder, please note that the second steam outage is scheduled to begin at 7am on Saturday, May 13 and will end at 1am on Sunday, May 14 (as per the April 24, CSBO notice).

Your patience and cooperation during this service interruption is appreciated. If you have any questions or concerns please contact Shawn Payne, Chief Engineer, Energy Management at shawnp@yorku.ca or ext. 55437 or Gary Gazo, Medium Voltage Distribution engineer at gmgazo@yorku.ca or ext. 20949. For any concerns during the interruption, please contact Security at ext. 33333.