Asphalt, concrete and interlock repair work scheduled on both campuses

Construction sign

Asphalt, concrete and interlock repair work has been scheduled to be performed in various areas (roadways, pathways, building entrances) of the Keele and Glendon campuses beginning in June and continuing until roughly Oct. 30. All attempts will be made to minimize any inconvenience to the community.

For further information, contact Tim Haagsma, manager, grounds, fleet and waste management, at ext. 20303 or thaagsma@yorku.ca.